A leading international pharma company wanted to expand their logistics center in order to store highly sensitive materials at ambient, 2-8C,-20C,-40C and -70C temperatures. In addition, another specialized storage for hazardous materials was required. They contracted Miebach Consulting to design the new facility complying with all industry regulations. Miebach was responsible for the design of material flows, logistics processes, equipment and layout of all functional areas and new storage areas.
Project Scope
Evaluate planning data to simulate different future scenarios
Develop several options for the layout and material handling technique
Design the cold chain including functional areas and existing logistics center
Benefits
Optimal state of the art facility based on modular building concept
Flexible design for -20C and -40C areas that can be adapted as required
Redundancy of all critical elements to guarantee uninterrupted service