Miebach Consulting

Operations audit and long-term warehouse expansion

Consumer Goods

Warehouse Design

Operations Audit

Projects

Project Summary

An organic foods producer had experienced large growth rates over the last ten years. The current warehouse had difficulties coping with the increased workload. Miebach Consulting was asked to enhance the performance in the short-term and to develop a long-term warehouse expansion plan. Miebach suggested installation of picking mezzanines and reorganizing with additional shelves to increase performance. In addition, a high-bay storage system is planned to meet future inventory requirements.

Project Scope

  • Warehouse fine-tuning to ensure an efficient short-term logistical process

  • Design new picking platform and racking modification for space efficiency

  • Extension plan for storage logistical requirements in a ten year time span

Benefits

  • Increased flexibility with a multi-tiered expansion plan over time

  • Minimized short-term investments that achieve performance goals

  • Increased picking performance by 100%

  • r
  • s
1
3