Business Challenge

A food manufacturer with demanding product quality standards wanted to significantly increase its production output. The existing processes were characterized by strict quality requirements, complex sequencing in production, and tight constraints in pre-production. At the same time, available floor space was limited and investments in additional equipment were only feasible to a limited extent. Overall Equipment Effectiveness (OEE) varied widely across all lines, with fruit preparation identified as a key bottleneck. Manual and duplicated process steps, along with waiting times, disrupted the production flow and limited the potential for scaling operations.

Solution Delivered

Miebach supported the client in achieving its ambitious production goals by identifying bottlenecks, optimizing processes, and enabling rapid, practical improvements.


We started with a comprehensive analysis of all relevant processes across planning, production, and intralogistics. Based on this assessment, we developed targeted solution concepts that combined technical and organizational improvements. These included harmonizing capacities between pre-production and main production, designing future-state processes, and applying modern technologies to reduce setup times.

 

We strengthened the food manufacturer’s planning processes through transparent IT-based tools and implemented a custom dashboard in fruit preparation to improve control. Furthermore, we introduced AI-enabled equipment that helps to identify foreign objects. To support flexible workforce deployment, employees received targeted training.

 

The developed measures were evaluated based on effort, impact, and strategic alignment, enabling fast implementation of high-priority initiatives.

 

 

Dr. Reiner Friedland, Miebach Consulting GmbH This project shows that significant performance gains are possible without heavy investments. By combining process transparency, modern technology, and training, we helped our client unlock capacity, eliminate bottlenecks, and build a foundation for continuous improvement.”

Miebach Project Lead, Dr. Reiner Friedland, Miebach Consulting GmbH

 

Results & Benefits

The implemented improvements significantly increased the client’s production performance without the need for additional equipment. The process landscape was significantly streamlined, resulting in better asset utilization, improved planning transparency, and increased workforce flexibility.
Non-value-adding activities were eliminated, freeing up space and generating sustainable economic value. The solutions delivered not only short-term gains but also established a strong foundation for continuous improvement.

 

 

10%
increase in in production output without extra equipment investment

€1 M+
additional annual profit

 1,400 m²
freed-up production space

 

Read more about it:

shutterstock 2072431721 Gorodenkoff PPT
Synchronizing Production for Competitive Advantage
Overview: In a business environment where customers expect individualized products delivered at speed, the pressure on manufacturing and logistics systems continues to grow.
Fabrikplanung Schaubild EN Slider
Smart Greenfield Factory Planning
Case Study: An international automotive supplier in the e-mobility sector planned the development of a new production facility for battery housings in Germany.
shutterstock 2248569293 Gorodenkoff PPT
Smart Use of AI in Production
Article: Artificial Intelligence (AI) is increasingly becoming a significant part of our daily lives, and it also offers great potentials for production systems.
Analysis and identification of weaknesses Slider
Value Stream Analysis and Design for More Efficiency and Flexibility in Series Assembly
Case Study: An industrial company in the field of series assembly faced the challenge of integrating new product variants into existing production processes.
KPI Production System Slider
Transforming KPI Systems for a Machinery Manufacturer
Case Study: The client, a German special machinery manufacturer, was undergoing a major transformation to reposition itself as a series supplier.

 

Struggling with bottlenecks in your production? We help you unlock capacity and achieve measurable gains.

 

Contact us!

Contact

DEU Friedland Reiner

Germany


Dr. Reiner Friedland

Head of Production Services


+49 30 893832-0
Send a Mail